Report savings (MEMU)

Verifying the Return-of-Investment is essential to the Client and Shareholders. The ability to monitor pre & post contact energy use and produce a final report can be achieved by the installation of an EECO2 MEMU (Mobile Energy Monitoring Unit). See MEMU section for details

EECO2 have successfully reported the energy savings in projects ranging from £10k to >£500k by installing a MEMU at the project outset. The unit can remain on site for the duration of the project and is monitored by EECO2 and the Client through the various stages of construction.

For information about energy reporting, contact Energy Efficiency Consultancy (EECO2) by calling +44 (0)1625 660717 or email the team on info@eeco2.co.uk 

Click on the image below ‣